Contents
Some common types of scaffolding are as follows:
- Single pole (standard) type scaffolding (Putlog Scaffold)
- Double pole (standard) type scaffolding (Independent Scaffold)
- Rolling Scaffolding, Trestle, Mobile Towers, Patented Scaffolding (Mobile Scaffold)
- Outrigger Scaffolding
- Swinging (Hanging) Scaffolding
- Suspended Scaffolding
- Boatswain’s Chair
Single pole type scaffolding (Putlog Scaffold)
The upright (vertical poles/Standard) should rest on a strong foundation to support the load without a settlement. They should not be kept more than 3 meters apart.
CLICK HERE FOR > SCAFFOLDING CAPACITY
CLICK HERE FOR > JSA
CLICK HERE FOR > HIRA
CLICK HERE FOR > SAFETY PLAN
CLICK HERE FOR > MONSOON SAFETY PLAN
CLICK HERE FOR > COVID-19 SAFETY PLAN
Tubular uprights have steel base plates placed on wooden/steel sole plates. Soft ground should be well rammed and leveled.

Fixing like steel bolts, nails of fiber rope of approved size, joint pins and couplers should be properly fitted. For load-bearing right-angled or swivel, couplers must be used.
Putlog couplers are useful for putlog members only. Putlog members (horizontal, ledger) must be at least 10-20 cm be inserted in the wall. Bracing (diagonal connection) must be tied to ensure structural stability and prevent buckling.
CLICK HERE FOR 👉 SCAFFOLDING NEAR MISS
To prevent overturning the scaffold should be secured at intervals not greater than 7.6 m vertically and horizontally.
Double pole (standard) type scaffolding (Independent Scaffold)

This is an independent scaffold without any support of other structures/walls.
Rolling Scaffolding, Trestle, Mobile Towers, Patented Scaffolding (Mobile Scaffold)
Such scaffolds move on rollers (wheels) or castors with wheel locking device. They are portable and most useful for maintenance.
To prevent overturning, height should not be more than three times the minimum width of the base. The minimum base length should be 4 feet.
CLICK HERE FOR 👉 WORK AT HEIGHT
While pushing or pulling the tower, persons should not ride/work on it. Tools and materials should be removed before moving.
The top working platform must have handrails and toe guard/board. It should support a 30 lb/ft2 distributed the load.
The rigidity of the tower is secured by diagonal bracing on all four sides and on the plan. Moving the tower scaffolding by pulling at the top or leaning sideways should be avoided.
Rolling or mobile tower scaffold is shown below.

Outrigger Scaffolding
It is a balcony type cantilever scaffold resting on the wall. If other types of the scaffold are possible, this type should not be used.
The outriggers should be passed right through the wall and be secured on the inner side. Supporting hook between brick joints is dangerous.
CLICK HERE FOR 👉 HIRA
The platform should not project beyond 2 meters from the wall. Guard rail and toe board should be provided.
Swinging (Hanging) Scaffolding

Here the platform is hanging by two chain pully blokes, ropes and hooks on supporting beam. The suspended platform can be raised or lowered as per need.
The movement of both ends should be simultaneous. The anchorage and the suspension gear should be strong enough to withstand the load with good factors of safety.
Suspension ropes should withstand 6 times (safety factor 6) the intended load. Rope diameter shall be more than 0.75 inches.
A safety rope shall be provided in addition to the suspension ropes.
The width of the platform must have more than 50 cm and less than 90 cm. Guard rails and toe boards/guard necessary on all t sides open. The platform must be lashed or secured while in use to prevent swaying.
Each person working on a swinging scaffold should wear Full body safety harness with a lifeline attached to an anchorage other than the scaffold itself.
Lifeline must be able to carry a minimum weight of 2268 kg.
Suspended Scaffolds
Two or more platforms are suspended by ropes from overhead outriggers anchored to the building.
Such scaffolds are designed with a factor of safety 4 and shall never be overloaded. Anchor plates should be tied with U bolts. Counterweights are used to prevent overturning. Wire ropes (FS 6) are used to support scaffold.
CLICK HERE FOR 👉 EXCAVATION SAFETY
Hoisting drum (like winch) is used with at least 2 dead turns. The gap between the handrail and toe board should be covered by a wire mesh of 38 mm and 16 gauge wire. Overhead protection should be provided if the risk of falling objects is possible.
Boatswain’s Chair

Boatswain’s Chair is used for supporting and hoisting a single person in a sitting position. General Chair (seat) size is 60 cm × 30 cm, with 25 mm thick timber. Cleats extending in front to at least 23 cm should be securely fixed under the chair at both ends.
The chair is supported by a suitable sling passing through the four corner holes in the chair for proper stability. The suspension rope is fixed to overhead support or passed through a pully block fastened to such support.
CLICK HERE FOR 👉 SAFE WORKING LOAD
The free end is secured to a conveniently accessible anchorage and the person in the chair must wear a safety belt, the lifeline of which is secured to the tackle supporting the chair, Fibre rope slings should not be used if the person in the chair has to do welding or cutting work.
Types of scaffolding components/Parts of scaffolding
SCAFFOLDING PARTS
- Sole-plate
- Scaffolding Tube
- Scaffolding Clamps/Couplers
- Base Plate
- Scaffolding Planks
- Toe Board

Scaffolding Tube

Scaffolding Clamps/Couplers

Base Plate

Scaffolding Planks

Toe Board

Also, read this:
People also search for
- Types of scaffolding in India
- Types of scaffolding Uk
- Classification of scaffolding
- Three types of scaffolding
- Scaffolding parts name with pictures pdf
- Parts of scaffolding
- Scaffolding Parts Name
PLEASE SHARE THIS ARTICLE WITH YOUR FRIENDS

Sir Kindly share Erection of Plan with checklist.
And what should be counter weight of crane from Load. ?
And whose RPM should be more in Grinding Machine and Grinding wheel ?
what is
1)H FRAM SCAFFOLDING
2) CROSS BAR SUPPORT AND THE INTERLOCKING plan section elevation
Cuplock or H-Frame Scaffolding is a framework made of materials erected to provide a stable working platform used to facilitate the repair and construction of buildings. It is erected using a system made up largely of metal tubes and wooden platforms on which workers stand to access the building being worked on.
H Frame scaffolding is Ladder Type Scaffolding Frame System Used in Mason Scaffolding, Indoor Mobile Scaffold Tower. H Frame Scaffolding Components Include Vertical Main Frames, Cross Braces, Coupling Pins, and Cat Walk Boards with hooks. H Frame Scaffolding is quick erection scaffolding by main frame lock pins and cross braces.
What an interesting post, I just read it from start to end your blog post. It describes all the different types of scaffolding used in the construction of tall building. This will help many people in getting knowledge about it. An informative blog. Thanks for such a great post ever.
Sir, How many types of scaffolding clamps?
Please sir answer my whatsapp no 8101876877
1. SWIVEL COUPLER
2. EXTERNAL SWIVEL COUPLER
3. DOUBLE COUPLER
4. BEAM CLAMP
5. PUTLOG COUPLER
6. BOARD CLAMP
7. EXPENDING JOINT
3. Right angle fix coupler ( double coupler )
8. Beam swivel coupler
Very good Sir.
Sir you have send good knowledge for increase my growth.
So i requested to you if you will be able to send me critical lifting . How can prepared critical plan.
My what’s no is – 9601424921
http://rlsdhamal.com/safety-in-rigging-and-erection-operations/
Sir please pdf file send me some topic
Scaffolding
Confind space
H2S
RT
JSA
Risk Assessment
My WhatsApp no 8480677151
irshadalisafety@gmail.com
Ok
ok .
Can you please explain about Raod safety in more details.. than you Sir,
Dear sir please visit the below link.
1. http://rlsdhamal.com/transport-safety-vehicle-safety/
2. http://rlsdhamal.com/why-seat-belt-is-mandatory-while-driving-the-car/
3. http://rlsdhamal.com/dump-tipper-truck-safety/