Home SAFETY WORK SITE HAZARD ASSESSMENT Shifting of material by tower crane

WORK SITE HAZARD ASSESSMENT Shifting of material by tower crane

Tower crane safety AND Hazard
TaskRISK LEVELHAZARDSSourcesENGINEERING OR

ADMINISTRATIVE CONTROLS

 

Control

Measure

PPE

(Refer to PPE )

Contents

Individual Task

Use Risk

Identify Hazard’s associated with task

List of Sources

·    List procedures that apply

·    List appropriate engineering controls.

·    List procedures or other administrative controls.

List of measure

List appropriate PPE

Shifting of Material by use of Tower crane.

 

 

Low

  • Fall of Material.
  • Non use of PPE’s.
  • Rash operating.
  • Work on overconfidence.
  • Use shortcut.
  • Not proper communication & signalling.

·

  • Not use of PPE’s.
  • Bad Housekeeping.
  • Lack of work knowledge.
  •  Listening of music on mobile.
  • Talking on mobile phone.
 

 

  • Site Engineer.
  • Safety Department Controls.
  • Site administrative Dept.
  • Proper Supervision.
  • Walkway free from Obstruction.
  • Check all part of tower crane before us
  •  Medical check up of operator.
  • 3rd party inspection of TC.
  •  Read site instruction.
  • Tool-Box-Talks.
  •  Proper training to signalman.
  • ·Making the worker aware of signal given by operator.
  • Display singed board.

 

Helmet, Safety-Belt, Safety Shoes, Fall- Arrest-or with guide rope, Goggles.

3 COMMENTS

  1. sir i am a regular reader of your site, and a lots of safety practices i learnt from various article. Thanks for your dedication towards spreading Safety awareness and build a Safety culture. Si i need your contact number if possible pls share me . its urgent.

Leave a Reply