WORKSITE HAZARD ASSESSMENT EXCAVATION WORK

HAZARD ASSESSMENT EXCAVATION WORK

Contents

Individual Task

Use Risk

Identify Hazard’s associated with task

List of Sources

·    List procedures that apply

·    List appropriate engineering controls.

·    List procedures or other administrative controls.

List of measure

List appropriate PPE

Excavation work

 

 

Low

  • Approach to work area.
  • Water Logging.
  •  Land Sliding.

·       Underground electrical cable.

  • Use shortcut.
  •  Not use of access or working platform.
  • Not proper Dewatering.
  •  Lack of work knowledge.
  • Listening of music on mobile.
  • Talking on mobile phone.
  •  Site Engineer.
  •  Safety Department Controls.
  •  Site administrative Dept.
  • Proper Supervision.
  • Walkway free from Obstruction.
  •  Provide safe working platform.
  •  Provide proper planning.
  •  Provide standby pumps.
  • Read site instruction.
  •  Tool-Box-Talks.
  •  Barricading Excavated Area.
  •  Making the worker aware of signal given by operator.

 

 

Helmet, Safety-Belt, Safety Shoes or gumboot, Hand gloves, Goggles.

3 COMMENTS

Leave a Reply