At the construction site, the two cranes, Crane A and Crane B, were positioned on either side of the construction area, ready for the tandem lift. The equipment, weighing several tons, was rigged and attached to the hooks of both cranes. The ground crew, including signal persons and riggers, were in position to guide the cranes during the operation.